BUILDING COST DATABASE®
MALAYSIA
|
Forgot Your Password?
|
Back to login
|
About Us
COMPANY ESTABLISHMENT
PLAN PLUS Sdn. Bhd. was incorporated in 2002. In 2005, we changed our name to BCD ASIA Sdn. Bhd. A strategic move that we believe will strengthen our business position as we strive to provide quality and efficient services.
In the early 2007, BCD Asia Sdn. Bhd. was granted MSC status by Multimedia Development Corporation Sdn. Bhd. (MDec). BUSINESS VISION
BCD ASIA SDN. BHD. is a multi-disciplinary practice (MDP) where our business activities focus on the research, development and implementation of construction technologies solutions and rendering consultancy services for the Architecture, Engineering and Construction (AEC) industry.
The Conceptualisation of Building Cost Database®
In the late 1990s, during the days when the word "mega projects" was the buzz word for the building and construction industry in Malaysia, numerous professional consultants, ranging from architects, engineers and quantity surveyors saw the need within the construction industry for a comprehensive building and construction cost reference book.
From this early vision, BCD Cost Handbook was formulated, with the objective of providing a comprehensive and detailed building cost reference embracing all sections of the building industry. With the advent of the Internet, this medium serves as a perfect medium for updating and disseminating information.Today, BCD Asia uses this medium to interact, to disseminate and deliver a string of their products and services on a secured and real–time environment. Cost audited by
Veritas Contracts Sdn. Bhd is a Quantity Surveying Practice registered with the Board of Quantity Surveyors, Malaysia and has offices in Kuala Lumpur, Johor and Penang.
|
It is said that many variables have to be considered when estimating.
If everyone in a department was asked how much it would cost to hang a door, some will jump in and give a price, other will want more details. Who will supply the material? and this may seem enough information for some, but others will still want more information, e.g. Who is to do the painting? In what location? Is it a job located in the rural area? is there only one door to hang? etc.
Only when all the details are known, can the pricing begin, but there will be some variation in the price due to difference in material cost, but mainly due to variation in the time labor will take to do the job and although the difference are only small estimate here, on a similar ratio on a large project, it could be the difference between winning or losing a contact.
Phone
+603 2164 4113
|
|
General Emails
enquiry@bcd-asia.com
|
|
Reach Us
B-7-13 Block B, Megan Avenue II
No. 12, Jalan Yap Kwan Seng 50450 Kuala Lumpur, MALAYSIA |